Saigon’s Metro: Line 1 in Service and Line 2 Under Construction
For decades, Ho Chi Minh City moved on two wheels. Millions of motorbikes, a few buses and a lot of patience. Since 22 December 2024, it has also had a metro. Line 1 runs from Ben Thanh in the centre out to Suoi Tien in the east, and in its first full year it carried 20.5 million passengers, 21.6% above its target (HURC1, January 2026).
Line 2 broke ground in January 2026. Here is how the Saigon metro works today and where it is heading.

Line 1, Ben Thanh to Suoi Tien
Line 1 is just under 20km long. It starts underground at Ben Thanh, beside the famous market, runs beneath the old centre to the Opera House and Ba Son, then rises onto an elevated track across the Saigon River and out through Thu Duc to Suoi Tien, near the city’s eastern edge.
For residents, the stations that matter most are in the middle of the line. Thao Dien and An Phu serve the leafy neighbourhoods that have long been home to much of Saigon’s international community, with their cafes, international schools and riverside apartments. The ride into the centre now takes minutes and avoids the traffic on the bridges altogether.
| Line 1 route | Ben Thanh to Suoi Tien, just under 20km |
| Opened | 22 December 2024 |
| Passengers in 2025 | 20.5 million, 21.6% above target (HURC1, 2026) |
| Line 2, first section | Ben Thanh to Tham Luong, about 11.3km, 10 underground stations and 1 elevated station |
| Line 2 cost | Over VND 55 trillion, about US$2.12 billion |
| Line 2 groundbreaking | 15 January 2026, with completion targeted for 2030 |
Line 2, Ben Thanh to Tham Luong and Thu Thiem
Line 2 will become the city’s second backbone. Its first section runs from Ben Thanh north west along Cach Mang Thang Tam and Truong Chinh to Tham Luong, passing close to Tan Son Nhat International Airport. It has 10 underground stations and one elevated station at Tan Binh, and it will run fully driverless trains at the highest level of rail automation (MAUR, January 2026).
Construction of a second section, from Ben Thanh east under the river to the new Thu Thiem district, began on 29 April 2026. When both sections are complete and joined by a planned line from Thu Thiem to Long Thanh, the city will have a rail corridor linking Tan Son Nhat, the city centre and the new Long Thanh International Airport.

The wider network
Ho Chi Minh City has set out an ambitious plan for the rest of the decade, with several more lines prioritised for investment between 2026 and 2030. They include a link to Binh Duong New City, an extension of Line 2 further north west, and a line to the coastal district of Can Gio, which is scheduled to open in 2028. Station works for Line 2 have been under way across the centre since the autumn of 2026.
Using the metro as a visitor or resident
The metro is clean, air conditioned and easy to use, with signs in Vietnamese and English. For visitors, Line 1 is a pleasant way to see the city from above, especially on the elevated stretch across the river towards Thu Duc. For residents of Thao Dien and An Phu, it has turned a stressful commute into a predictable one.
As the network grows, it will change where people choose to live. Neighbourhoods close to Line 1 already feel more connected, and the districts along Line 2, from Tan Binh near the airport to Thu Thiem across the river, are next.
A city on the move
Saigon will always have its motorbikes. It now has an alternative, and by the end of the decade it will have a network. If you are planning your first trip, read our route through Vietnam from south to north. If you are thinking about living in the region, browse homes on the Asia Lifestyle Magazine property portal.







